MOHICAN

Maintains Out of Hydrates In Cold Areas Network

The aim of this project is to develop a heating system for underwater pipelines used in offshore oil production in order to prevent the formation of hydrate locks and production interruptions.

This project was approved in May 2006.

 

Project leader

DORIS Engineering

Industrial partners

DORIS, EMC3, OCEANIDE, TOTAL

Budget

390 K€

This project is self-funded